Study & Design of Utilization of Dam Water
Overview
The primary purpose of the project is developing concepts for the utilization of the water from 100 dams (48 of which are operating, 52 are under construction or planned), located in the west and south-west of the Kingdom of Saudi Arabia. At a later stage of the project, detailed designs, ready for tendering for water utilization infrastructures shall be provided. As main criteria for future dam water use, the amount of available water (hydrological study) and its quality have been identified. A further criteria is the water demand in the vicinity of the dams (e.g. for agriculture / irrigation or domestic water supply) which has been identified by comprehensive studies.
Our Services at a glance